TOC and CHIP Entitlement Consulting in Los Angeles

Transit Oriented Communities (TOC) was the City of Los Angeles program, created under Measure JJJ, that gave housing projects near major transit extra density, floor area, and relief from development standards in exchange for on-site affordable units. In 2025 the City folded TOC into the Citywide Housing Incentive Program (CHIP), whose Mixed Income Incentive Program now carries the transit-area incentives forward alongside new incentives for 100 percent affordable housing and State Density Bonus projects.

How the transit incentives work

The basic trade has not changed since TOC: build a set share of affordable homes on site, and the City allows a larger project than the base zoning would. Incentives scale with how close the site is to qualifying transit and how much affordability the project includes.

  • More units and floor area than base zoning allows.
  • Height and setback relief through a menu of base and additional incentives.
  • Reduced or eliminated parking, especially near major transit, where state law (AB 2097) also limits parking minimums.
  • Affordable units secured by covenant, recorded with the Los Angeles Housing Department (LAHD).

What changed with CHIP

CHIP took effect in 2025 as part of the City’s Housing Element rezoning program. It organized the City’s housing incentives into three tracks:

  • Mixed Income Incentive Program, which includes transit-oriented incentive areas that replace the TOC tiers, plus opportunity corridors. In 2026 the City’s SB 79 implementation added the Low-Rise Incentive Area for lower-density lots near Opportunity Stations.
  • Affordable Housing Incentive Program, for 100 percent affordable projects.
  • State Density Bonus, the City’s local procedures for Government Code 65915.

Projects approved under the old TOC Guidelines keep their entitlements; new applications generally go through CHIP. Projects that use only the listed incentives are typically reviewed ministerially, while requests beyond the menu add a discretionary step.

Where projects get stuck

  • Confirming the correct transit area and tier for a parcel, especially where bus routes or service levels have changed.
  • Choosing between CHIP, State Density Bonus, and SB 79 on the same site, which each carry different affordability and review trade-offs.
  • Existing tenants and rent-stabilized units, which trigger replacement requirements under the Housing Crisis Act (see SB 8 Replacement Unit Determinations) and the City’s Resident Protections Ordinance.
  • Covenant, environmental, and plan-check clearances after the planning approval.

How QES helps

QES has processed TOC projects since the program began, including a 30-unit, six-story TOC project for Gerlach Development (TAG Architects), a 50-unit TOC project for EAH Housing (FSY Architects), and a 40-unit TOC project for IKON, Ltd (PK Architecture). We start with a parcel-level comparison of every available path, then handle the application, agency coordination, LAHD covenant, and clearances through permit.

Frequently asked questions

What is the TOC program in Los Angeles?

TOC (Transit Oriented Communities) was a City of Los Angeles incentive program created by Measure JJJ that allowed larger housing projects near major transit in exchange for on-site affordable units. Since 2025 its transit-area incentives have continued under the Citywide Housing Incentive Program (CHIP).

Is TOC still available?

New applications generally use CHIP’s Mixed Income Incentive Program, which carries forward transit-area incentives similar to TOC. Projects already approved under the TOC Guidelines keep their approvals. Confirm the current rules for any specific parcel before filing.

Who qualifies for transit-area incentives under CHIP?

Housing projects in qualifying transit-oriented incentive areas that include the required share of affordable units on site. Eligibility depends on distance to qualifying transit, the base zone, and exclusions such as certain hillside, fire hazard, historic, and coastal areas.

How long does a CHIP or TOC-style approval take?

Projects that use only listed incentives are typically reviewed ministerially, which can take weeks to a few months. Projects requesting additional relief go through discretionary review and commonly take six to twelve months or more, plus plan check.

What approvals are typically needed?

A City Planning approval or ministerial sign-off for the incentives, an LAHD affordable housing covenant, any required SB 8 replacement unit determination, environmental clearance where applicable, and building permits.

How does QES help with TOC and CHIP projects?

QES compares CHIP, State Density Bonus, SB 79, and by-right options for the parcel, prepares and files the application, coordinates with City Planning, LAHD, and other agencies, and manages clearances through building permit.

This page is general information about land use processes in Los Angeles and Southern California, not legal advice. Rules change and every parcel is different; confirm current requirements for your specific site.

Talk through your site with QES

Every parcel has its own best path — and the right one usually depends on details a quick zoning lookup won’t show. QES has guided entitlements on more than 500 projects across Los Angeles city and county since 1993. Tell us about your site and we’ll give you a straightforward read on your options.

Request a consultation

Prefer to call or email? Reach Eric Lieberman at 818.997.8033 or ericl@qesqms.com, or use our contact page.

QES Inc. is proud to help foster quality development in the communities we serve and in which we all live, work, and play.